Permits & Approvals

BC Strata Renovation Approval Checklist

What BC strata owners should gather, confirm, and submit before scheduling renovation work inside a condo or townhouse.

Before scheduling renovation work in a BC strata property, obtain the current bylaws and rules, define the proposed alteration in writing, and confirm whether the strata corporation requires written approval or an alteration agreement. Municipal permits and trade permits are separate checks.

Every strata can amend its bylaws, so another building's approval process is not a reliable template for yours. The Province's strata bylaws and rules guidance explains that bylaws may require written permission for changes such as moving walls, changing flooring, or making plumbing or electrical alterations.

1. Obtain the current documents

Ask for the documents that apply to the property and proposed work:

  • current registered bylaws and applicable rules
  • renovation application form or process
  • alteration agreement template, if used
  • strata plan showing unit and common-property boundaries
  • move, elevator, parking, noise, and working-hour rules
  • insurance or contractor-document requirements
  • any building-specific specifications for flooring, waterproofing, plumbing, ventilation, or electrical work

Do not rely only on a welcome package or an old copy saved by a previous owner. Strata corporations can amend their bylaws, and sections within a strata may have additional bylaws.

2. Identify what belongs to the strata lot

The visible interior of a unit does not always define the legal boundary. Floors, walls, ceilings, windows, balconies, piping, and other elements may involve common property, limited common property, or parts the strata corporation must insure.

The Province's common-property guidance explains why the strata plan and bylaws matter when assigning responsibility and approving alterations.

For an early review, mark every part of the project that touches a wall, floor assembly, ceiling, exterior opening, shared system, or common-area route.

3. Confirm whether written approval is required

The Standard Bylaws under BC's Strata Property Act require written approval for specified alterations involving the building structure, exterior, certain exterior doors and windows, common property within a strata lot, and parts the strata corporation must insure. They also require written approval before an owner alters common property, including limited common property.

A strata can have amended bylaws, so read the rules that actually apply to your property. The current Standard Bylaws alteration provisions provide a useful legal reference, but they do not replace the registered bylaws for a particular strata.

If a proposed alteration would significantly change the use or appearance of common property or a common asset, the Province notes that a three-quarter vote may be required. That is a different approval level from a routine council decision and should be identified before the schedule is set.

4. Prepare a clear written scope

A concise submission is easier to review than a collection of product screenshots. Include:

  • the unit and strata lot number
  • existing-condition photographs
  • a written description of demolition and new work
  • drawings showing layout or fixture changes
  • flooring material and underlay information, if relevant
  • plumbing, electrical, ventilation, or waterproofing details
  • the anticipated work sequence and proposed hours
  • how common areas, elevators, and corridors will be protected
  • the names and documents of the parties doing the work, when requested
  • the municipal and trade permits required or being investigated

If the design is not final, label it as preliminary. Written clarity helps prevent an early concept from being treated as the approved construction scope.

5. Read the alteration agreement before accepting it

A strata may make approval conditional on a written agreement that assigns costs or ongoing responsibility to the owner. Review the proposed agreement alongside the bylaws, drawings, and scope. Confirm what happens if the work affects common property, causes damage, needs future access, or must be removed.

Keep the signed approval, agreement, approved drawings, permits, inspection records, and product information together. These records can matter during the work and later when responsibility or property disclosure questions arise.

6. Plan building logistics as part of the project

Approval is not the only strata constraint. Confirm:

  • permitted work hours and blackout dates
  • elevator booking and protection
  • contractor access and parking
  • debris-removal route
  • dust, noise, and water-shutoff procedures
  • notice required for neighbouring units
  • common-area cleaning and damage reporting

These requirements can affect sequence and cost even when the work itself is straightforward. Include them in the initial strata renovation scope rather than treating them as day-one details.

7. Keep municipal approvals separate

Strata approval does not replace a building, plumbing, or electrical permit. Check the municipality that governs the property and make sure the strata submission and permit drawings describe the same work. Surrey owners can begin with the Surrey renovation permit guide.

Once the documents and proposed work are organized, share the strata project details for an initial service conversation.

FAQs

Can a strata require approval for changing flooring?

Yes. The Province notes that strata bylaws may require written permission for flooring changes. The applicable bylaws and building specifications determine the process for a particular property.

Does strata approval replace a building permit?

No. Strata approval and municipal or trade permits are separate requirements and should be checked independently.

Why does an alteration agreement matter?

An alteration agreement may assign responsibility for costs, maintenance, damage, future access, or removal of the alteration. Review its terms with the proposed scope before accepting it.